New permit or Modification of 0 -1 Stormwater Control Measures (SCMs)
| $1,000 |
New permit or Modification of -2 Stormwater Control Measures (SCMs)
| $1,250 |
New permit or Modification of -3 Stormwater Control Measures (SCMs)
| $1,750 |
New permit or Modification of -4 or more Stormwater Control Measures (SCMs)
| $2,250 |
Annual Inspection Fee one SCM
| $190 |
Each additional SCM inspection on the same property
| $100 |
Reinspection Fee on one SCM
| $150 |
Reinspection of each additional SCM on the same property
| $60 |