Fee Schedule

DescriptionCost
New permit or Modification of 0 -1 Stormwater Control Measures (SCMs)
$1,000
New permit or Modification of -2 Stormwater Control Measures (SCMs)
$1,250
New permit or Modification of -3 Stormwater Control Measures (SCMs)
$1,750
New permit or Modification of -4 or more Stormwater Control Measures (SCMs)
$2,250
Annual Inspection Fee one SCM
$190
Each additional SCM inspection on the same property
$100
Reinspection Fee on one SCM
$150
Reinspection of each additional SCM on the same property
$60


Fees based on the adopted Craven County Fee Schedule.